In a nutshell
19th Jan----------->Submit Batchlist n Guides
5th Feb------------>Synopsis
16th n 17th Feb---->First Evaluation
23rd n 24th Mar--->Second Evaluation
11th n 12th May--->Final Evaluation
Project schedule details
SYNOPSIS SUBMISSION -Feb 5th
(One copy per group)SYNOPSIS:
1)Title of the project
2)Brief description about the project
3)Names of students, USN
4)Guide
5)Place of work
6)Approximate time of project completion(April end preferably)
NOTE:Synopsis not more than 1 1/2 - 2 pages.
FIRST EVALUATION - Feb 16th & 17th
Marks:15
5 for presentation
10 for report
REPORT:
1)Title of the project
2)Batchmates,Guide
3)Aim and Objective(using bullets)
4)System analysis(software and hardware)
5)Literature survey(supporting materials-reference books,websites etc)
REPORT:
Abstract
Chapter 1.0:introduction
Chapter 2.0:literature survey
Chapter 3.0:system analysis-->description,software,hardware
NOTE:Report not more than 10-12 pages, 1 hardcopy per batch.
SECOND EVALUATION - March 23rd & 24th
Marks-30(10 for presentation+20 for report)
REPORT:
6)System design
->Architectural design--->block diagram presentation|
->Detailed design |PPT
|
{data flow diagrams,flow charts,uml}
REPORT:
Chapter 4.0:System design
4.1:Architectural
4.2:Detailed Conclusion
Chapter 5.0:Implementation : language details, OS details, protocols
(flowcharts, pseudo code)
FINAL EVALUATION - May 11th,12th & 13th
Marks:
20 for PPT
30 for report
REPORT:
Chapter 6.0:System testing-->indicate test cases
Chapter 7.0:Results n Conclusions
Bibliography
Appendix
----------------------------------------------------------------
SEMINAR DETAILS
FIRST EVALUATION - Feb 9th & 10th
Marks:25
SECOND EVALUATION - April 6th & 7th
Marks:25
-------------------------------------